Upgrading of Asian Alcohol Corporation 1.5 MVA power substation 4.160 KV main circuit protection for normal and continuous production
Page views
331Petsa
2007May-akda
Tagapayo ng Tesis
Tagapangulo ng Panel ng Depensa
Magbahagi
Metadata
Ipakita ang buong tala ng item
Abstract
The purpose of this study is to determine the needs and requirements for a best design for the upgrading of Asian Alcohol Corporation (AAC) 1.5 MVA power substation main circuit protection for a reliable and continuous production and cogeneration to other power source for total system flexibility. The research design adopted the descriptive analytical study that utilized document analysis and direct observation. The existing power system set-up was evaluated using the plant single line diagram, equipment name plate rating, kilowatt hour (KWHr) meter reading, substation base and line data from the utility company to determine the system future capacity requirement, system short circuit and co-generation capability. The best upgrade design of AAC 1.5 MVA power substation main circuit protection while on continuous production was determined using the System Fault Analysis in conformity with the standards of the Philippine Electrical Code (PEC) 2000. The AAC 1.5 MVA 4.160 KV main circuit protection shall be a 600 ampere tripping current capacity, 8 KAIC, 20 KA, 3.6/ 7.2 KV, 3-phase for a reliable and continuous production. The study covers the data from the daily performance report of the power generation department and the monthly power utility company billing from operation year 2003-2005.
Paglalarawan
Abstract only
Mungkahing Sipi
De La Cruz, V. H. V. (2007). Upgrading of Asian Alcohol Corporation 1.5 MVA power substation 4.160 KV main circuit protection for normal and continuous production (Unpublished Master's special paper). Central Philippine University, Jaro, Iloilo City.
Uri
Special paperMga Paksa
Mga keyword
Kagawaran
College of EngineeringDegree
Master of EngineeringLokasyon ng Istante
GSL Theses 620.0072 D371
Pisikal na paglalarawan
viii, 67 leaves
Collections
Ang mga sumusunod na mga file ng lisensya ay naiugnay sa item na ito:
Maliban kung sa kabilang banda ay nabanggit, ang lisensya ng item na ito ay inilarawan bilangAttribution-NonCommercial-NoDerivs 3.0 Philippines
Mga parehong item
Ipinapakita ang mga item na nauugnay sa pamagat, may-akda, tagalikha at paksa.
-
A proposed intervention to improve the power quality and system efficiency of Calinog substation feeder 2
Roquios, Jose Redmond Eric S. (2007)Rationale Iloilo II Electric Cooperative, Inc. (ILECO II) is an electric distribution utility which supply electric power to the central part of the Province of Iloilo. With the passage of the RA 9136 otherwise known as ... -
The effect of rewiring the electrical power distribution system on the output voltages and maintenance at Central Philippine University
Idemne, Vitini Edhard O. (2007)This study aimed to assess the effects of rewiring the Electrical Power Distribution System on output voltages and maintenance of electrical devices at CPU campus. Specifically it determined and compared the output voltages ... -
Proposed quality maintenance system for diesel power plant (abstract paper)
Longno, Gilbert S. (2002)Rationale/introduction of the study Diesel Power Plants assume a vital role in the global as well as countries’ economy by providing quick response to power generation demand whenever and where ever they are needed. The ...