Impact study on the additional air conditioning load at Central Philippine University
요약
This study examines how an added load on the electrical infrastructure of Central Philippine University (CPU) affects the system’s capability to carry increased energy requirements. The research targets the evaluation of existing transformer banks and energy consumption patterns to find if the current infrastructure is sufficient to support added cooling systems without causing power overloads or voltage instability. The data collection was done by measuring load, transformer capacity and energy consumption with a data logger and a systematic measurement technique. The baseline energy consumption of university buildings was also studied, energy requirements of new air conditioning units were estimated, and the total energy consumption was projected including the new load. The key findings indicate that the electrical system of the CPU may need improvement in the transformer capacity, power factor correction and load distribution for system reliability and efficiency. The results presented in this research can be used to help the university administration, facilities management, and future researchers find ways of developing sustainable energy solutions and infrastructure improvements in academic institutions.
기술
Abstract only
추천 인용
Biongan, S. M. B., Davila, K. C. V., Dayot, P. P., Jamora, S. G. L., & Soltis, S. S. (2025). Impact study on the additional air conditioning load at Central Philippine University [Unpublished bachelor's special paper]. Central Philippine University.
유형
Special paper주제
키워드
학과
College of Engineering정도
Bachelor of Science in Electrical Engineering선반 위치
TK 165 .B56 2025
물리적 설명
viii, 144 leaves
Collections
Related items
Showing items related by title, author, creator and subject.
-
A proposed intervention to improve the power quality and system efficiency of Calinog substation feeder 2
Roquios, Jose Redmond Eric S. (2007)Rationale Iloilo II Electric Cooperative, Inc. (ILECO II) is an electric distribution utility which supply electric power to the central part of the Province of Iloilo. With the passage of the RA 9136 otherwise known as ... -
Upgrading of Asian Alcohol Corporation 1.5 MVA power substation 4.160 KV main circuit protection for normal and continuous production
De La Cruz, Vic Harde V. (2007)The purpose of this study is to determine the needs and requirements for a best design for the upgrading of Asian Alcohol Corporation (AAC) 1.5 MVA power substation main circuit protection for a reliable and continuous ... -
The effect of rewiring the electrical power distribution system on the output voltages and maintenance at Central Philippine University
Idemne, Vitini Edhard O. (2007)This study aimed to assess the effects of rewiring the Electrical Power Distribution System on output voltages and maintenance of electrical devices at CPU campus. Specifically it determined and compared the output voltages ...





