• English
    • Filipino
    • 中文
    • 한국어
    • français
    • русский
  • 中文 
    • English
    • Filipino
    • 中文
    • 한국어
    • français
    • русский
  • Login
View Item 
  •   BAHÁNDÌAN 主页
  • College of Engineering
  • Undergraduate Research
  • Special Papers
  • Bachelor of Science in Electrical Engineering
  • View Item
  •   BAHÁNDÌAN 主页
  • College of Engineering
  • Undergraduate Research
  • Special Papers
  • Bachelor of Science in Electrical Engineering
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Optimization of protection coordination in the power system (OPCIPS) of Central Philippine University

Thumbnail
View/Open
COE_BSEE_GangeKVR_2025_Ab.pdf (310.6Kb)
Downloads: 8
Request
Request a full text copy
Page views
66
发表日期
2025-05
作者
Gange, Kert Val Roen G.
Labesores, Hart Jerome U.
Panhilason, Chester Al F.
Villalobos, Christia Marie A.
论文指导
Acanto, Caesar Rico
小组成员
Asuero, Fritz B.
Parreño, Marjee Rose B.
Armadillo, Rufel Zepth D.
股票 
 
元數據
显示条目完整记录

摘要
Central Philippine University (CPU) is a well-established school that has expanded over the years, resulting in increased demand for a reliable and efficient power system. However, its current protection coordination scheme is outdated and not adequate for the latest energy needs. The goal of the study is to build up an optimized protection coordination system for CPU power supply to improve its reliability. To initiate the study, the team conducted an extensive assessment of the current electrical system, reviewing historical fault records and component-level contributions to system failure. On the other hand, CPU still uses old electrical drawings which resulted in errors in coordination of fuse protection. The researchers then used the ETAP simulation software to examine the fault performance of the system. The findings were vast majority of coordination problems were located at Feeder 2 (65A, pole P03), RMA (100A, pole P15FDR2), JHS (40A, pole P26FDR2-T9), and near Mary Thomas building (50A, pole P32FDR2). In addition, a few locations were noted as having high fault potential, such as areas close to the Senior High parking area, LHB and Mary Thomas, Theology, Elementary, Engineering, LDT, and CHM buildings. Based on the analysis of the results from the fault identification survey and ETAP tests, the researchers proposed modifications were; change the fuse size of FDR2 UGym Iso 65A from 65A to 100A, FDR2 RMA Iso 100A from 100A to 80A, FDR2 Iso 40A located at pole P26FDR2-T9 from 40A to 50A, FDR2 MT Iso 50A located at pole P32FDR2 from 50A to 40A, installation of isolation fuse at pole P5FDR1 T-2 with rating of 30A, and installation of isolation fuse at pole P18FDR2 with rating of 65A. These modifications were already tested in ETAP to make sure the desired outcome are met.
描述
Abstract only
网址
https://hdl.handle.net/20.500.12852/3644
建议引文
Gange, K. V. R. G., Labesores, H. J. U., Panhilason, C. A. F., & Villalobos, C. M. A. (2025). Optimization of protection coordination in the power system (OPCIPS) of Central Philippine University [Unpublished bachelor's special paper]. Central Philippine University.
文件类型
Special paper
主题
Electric power systems--Protection OCLC - FAST (Faceted Application of Subject Terminology); Electric power distribution--Reliability OCLC - FAST (Faceted Application of Subject Terminology); Electric fuses OCLC - FAST (Faceted Application of Subject Terminology); Short circuits OCLC - FAST (Faceted Application of Subject Terminology); Electric fault location OCLC - FAST (Faceted Application of Subject Terminology); Electric power system stability OCLC - FAST (Faceted Application of Subject Terminology)
部
College of Engineering
学位
Bachelor of Science in Electrical Engineering
货架位置
TK 165 .G36 2025
物理描述
x, 209 leaves
集合
  • Bachelor of Science in Electrical Engineering [17]

相關項目

顯示由標題,作者,創造者和主題相關的項目。

  • Thumbnail

    Upgrading of Asian Alcohol Corporation 1.5 MVA power substation 4.160 KV main circuit protection for normal and continuous production 

    De La Cruz, Vic Harde V. (2007)
    The purpose of this study is to determine the needs and requirements for a best design for the upgrading of Asian Alcohol Corporation (AAC) 1.5 MVA power substation main circuit protection for a reliable and continuous ...
  • Thumbnail

    A proposed intervention to improve the power quality and system efficiency of Calinog substation feeder 2 

    Roquios, Jose Redmond Eric S. (2007)
    Rationale Iloilo II Electric Cooperative, Inc. (ILECO II) is an electric distribution utility which supply electric power to the central part of the Province of Iloilo. With the passage of the RA 9136 otherwise known as ...
  • Thumbnail

    Impact study on the additional air conditioning load at Central Philippine University 

    Biongan, Shan Michael B.; Davila, Kyle Christian V.; Dayot, Patricia P.; Jamora, Sean Gabriel L.; Soltis, Stroll S. (Central Philippine University, 2025-04)
    This study examines how an added load on the electrical infrastructure of Central Philippine University (CPU) affects the system’s capability to carry increased energy requirements. The research targets the evaluation of ...

联系我们 | Send Feedback | https://creativecommons.org/licenses/by/4.0/ Logo by HLL
Central Philippine University © 2026
Managed by 
Henry Luce III LibraryHenry Luce III Library
 

 

Links
BAHÁNDÌAN Repository GuideDisclaimerFAQsSubmit your workNews and Updates

浏览

全部BAHÁNDÌAN文献分类和数据库按发布日期作者标题关键词该集合按发布日期作者标题关键词

My Account

LoginRegister

Statistics

View Usage Statistics
CPU Henry Luce III Library

联系我们 | Send Feedback | https://creativecommons.org/licenses/by/4.0/ Logo by HLL
Central Philippine University © 2026
Managed by 
Henry Luce III LibraryHenry Luce III Library
 

 

EXTERNAL LINKS DISCLAIMER

This link is being provided as a convenience and for informational purposes only. Central Philippine University bears no responsibility for the accuracy, legality or content of the external site or for that of subsequent links. Contact the external site for answers to questions regarding its content.

If you come across any external links that don't work, we would be grateful if you could report them to the repository administrators.

Click DOWNLOAD to open/view the file. Chat Bertha to inform us in case the link we provided don't work.

Download