• English
    • Filipino
    • 中文
    • 한국어
    • français
    • русский
  • 中文 
    • English
    • Filipino
    • 中文
    • 한국어
    • français
    • русский
  • Login
View Item 
  •   BAHÁNDÌAN 主页
  • College of Engineering
  • Master's Special Papers
  • Master of Engineering
  • Master of Engineering major in Electrical Engineering
  • View Item
  •   BAHÁNDÌAN 主页
  • College of Engineering
  • Master's Special Papers
  • Master of Engineering
  • Master of Engineering major in Electrical Engineering
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

A proposed intervention to improve the power quality and system efficiency of Calinog substation feeder 2

Thumbnail
View/Open
Special paper introduction (80.19Kb)
Downloads: 91
Page views
888
发表日期
2007
作者
Roquios, Jose Redmond Eric S.
股票 
 
元數據
显示条目完整记录

摘要
Rationale

Iloilo II Electric Cooperative, Inc. (ILECO II) is an electric distribution utility which supply electric power to the central part of the Province of Iloilo. With the passage of the RA 9136 otherwise known as Electric Power Industry Reform Act of 2001 (EPIRA), ILECO II cannot just simply supply electricity to its member consumers.

EPIRA mandates all electric utility to ensure the quality, efficiency, security and affordability of the supply of electric power. It changes the rules of the energy industry. It ordains reforms and provide framework in restructuring the energy sectors.

The law also adopted and promulgated the Philippine Grid Code (PGC) and Philippine Distribution Code (PDC) which sets rules, requirements, procedures and standards for efficient operation and maintenance of transmissions and distributions systems in the country. The law envisioned the generation, transmission and distribution sectors to be efficient in all aspects of operation to protect the interest of the public as it is affected by the rates and services of electric utilities and providers of electric powers. Distribution utilities now, especially the electric cooperatives face many challenges to overcome in order to stay in the game. The government agency tasked to enforce RA 9136 and the code is the Energy Regulatory Commission (ERC).

This study will involve the analysis and propose intervention to improve the power quality and system efficiency of ILECO II Calinog Substation Feeder.

Calinog substation feeder 2 is chosen as a pilot feeder since it is one of the feeders which contributed to a high system losses of ILECO II. For the year 2006 with an input energy of 5,499,348 kwhr and output energy of 4,660,464 kwhr, feeder system loss is 838,884 kwhr or 15.25 %. This is very high and needs thorough analysis for appropriate programs in reducing the losses. Subsequently, feeders with high losses have proportionate problems with power quality.

Statement of the problem

A need to develop an effective method in conducting power system study of the ILECO II distribution system to ensure that it is providing its member consumers a quality and efficient electric service as prescribe by the Philippine Distribution Code. With the aid of Computer Software, the analysis is faster and the result is more accurate compared to the manual solving of complex distribution system.

Objectives of the study

The general objective of the study is to propose an intervention on how to improve the power quality and the system efficiency of Calinog Substation Feeder 2. Specifically, the study aims to address the following:

1. To identify what part of the system where under voltages, over voltages and voltage unbalances occur.

2. To identify what parts of the system have a significant and quantifiable losses.

3. To proposed a correction on improvement of power quality and checking the improvement through load flow simulation.

4. To proposed a system loss reduction activities.
描述
Introduction and statement of the problem
网址
https://hdl.handle.net/20.500.12852/1578
建议引文
Roquios, J. R. E. S. (2007). A proposed intervention to improve the power quality and system efficiency of Calinog substation feeder 2 (Unpublished Master’s special paper). Central Philippine University, Jaro, Iloilo City.
文件类型
Special paper
主题
Electric power systems--Electric losses OCLC - FAST (Faceted Application of Subject Terminology); Electric power systems--Quality control OCLC - FAST (Faceted Application of Subject Terminology); Electric power-plants OCLC - FAST (Faceted Application of Subject Terminology); Electric power-plants--Quality control OCLC - FAST (Faceted Application of Subject Terminology); Electric power-plants--Efficiency OCLC - FAST (Faceted Application of Subject Terminology); Electric power-plants--Maintenance and repair OCLC - FAST (Faceted Application of Subject Terminology); Philippines--Iloilo--Calinog OCLC - FAST (Faceted Application of Subject Terminology)
关键字
Iloilo II Electric Cooperative, Inc. (ILECO II); Calinog TGN
部
School of Graduate Studies
学位
Master of Engineering
货架位置
GSL Theses 620.0072 R689
物理描述
17 leaves
集合
  • Master of Engineering major in Electrical Engineering [32]

相關項目

顯示由標題,作者,創造者和主題相關的項目。

  • Thumbnail

    Upgrading of Asian Alcohol Corporation 1.5 MVA power substation 4.160 KV main circuit protection for normal and continuous production 

    De La Cruz, Vic Harde V. (2007)
    The purpose of this study is to determine the needs and requirements for a best design for the upgrading of Asian Alcohol Corporation (AAC) 1.5 MVA power substation main circuit protection for a reliable and continuous ...
  • Thumbnail

    The effect of rewiring the electrical power distribution system on the output voltages and maintenance at Central Philippine University 

    Idemne, Vitini Edhard O. (2007)
    This study aimed to assess the effects of rewiring the Electrical Power Distribution System on output voltages and maintenance of electrical devices at CPU campus. Specifically it determined and compared the output voltages ...
  • Thumbnail

    Proposed quality maintenance system for diesel power plant (abstract paper) 

    Longno, Gilbert S. (2002)
    Rationale/introduction of the study Diesel Power Plants assume a vital role in the global as well as countries’ economy by providing quick response to power generation demand whenever and where ever they are needed. The ...

联系我们 | Send Feedback | https://creativecommons.org/licenses/by/4.0/ Logo by HLL
Central Philippine University © 2023
Managed by 
Henry Luce III LibraryHenry Luce III Library
 

 

Links
BAHÁNDÌAN Repository GuideDisclaimerFAQsSubmit your workNews and Updates

浏览

全部BAHÁNDÌAN文献分类和数据库按发布日期作者标题关键词该集合按发布日期作者标题关键词

My Account

LoginRegister

Statistics

View Usage Statistics
CPU Henry Luce III Library

联系我们 | Send Feedback | https://creativecommons.org/licenses/by/4.0/ Logo by HLL
Central Philippine University © 2023
Managed by 
Henry Luce III LibraryHenry Luce III Library
 

 

EXTERNAL LINKS DISCLAIMER

This link is being provided as a convenience and for informational purposes only. Central Philippine University bears no responsibility for the accuracy, legality or content of the external site or for that of subsequent links. Contact the external site for answers to questions regarding its content.

If you come across any external links that don't work, we would be grateful if you could report them to the repository administrators.

Click DOWNLOAD to open/view the file. Chat Bertha to inform us in case the link we provided don't work.

Download