Search
Now showing items 1-4 of 4
A study to improve efficient islanding operation of 72 MW diesel engine power generating system of Panay Power Corporation
(2002)
At present, the 72 MW Panay Power Corporation operation department as well as the efficiency and result officer are very much aware of the situation that the ratio of fuel consumed by the system and the power generated is ...
A proposal on the integration of Engineering and Business (a curriculum development study)
(2002)
This work is focused on integrating a business component in computer engineering undergraduate curriculum program. It comprises the current course offerings and how they reflect in the perception of the ever - changing ...
Biogas production for domestic application
(2002)
The purpose of this research paper is to investigate the biogas production process. This aims to determine the process conditions that maximize biogas generation and the appropriate manure-water mixture that enhances biogas ...
Proposed wind power plant for power generation and irrigation system at Barangay Carabalan, Himamaylan, Negros Occidental
(2002)
Introduction
1.1 Economic Condition
The present power rate of National Power Corporation (NAPOCOR) is surging high due to inflation rate and maintenance cost of the existing Geothermal Power Plant that supplies electricity ...