Show simple item record

dc.contributor.adviserSantacera, Linie Rose D.
dc.contributor.authorTorres, John Bylle C.
dc.contributor.authorDela Cruz, Year Yveneil M.
dc.contributor.authorSantianes, Pedmar P.
dc.contributor.authorRoxas, Brent L.
dc.coverage.spatialAlimodianen_US
dc.date.accessioned2026-02-07T07:06:09Z
dc.date.available2026-02-07T07:06:09Z
dc.date.issued2024-12
dc.identifier.citationTorres, J. B. C., Dela Cruz, Y. Y. M., Santianes, P. P., & Roxas, B. L. (2024). Proposed design of a three-storey municipal fire station in Alimodian, Iloilo [Unpublished bachelor's special paper]. Central Philippine University.en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12852/3669
dc.descriptionAbstract onlyen_US
dc.description.abstractA fire station that adheres to standard requirements ensures the efficient operation of fire protection services by providing well-designed facilities for rapid response, and public safety. However, the existing fire station is plagued by inadequate facilities, no apparatus bay, and an unsuitable site, which hinders operational efficiency and does not meet current structural, safety, and sustainability standards. This project study focuses on the proposed construction of a 175 sq. m three-storey fire station in Alimodian, designed to accommodate the firefighters and the required facilities ultimately aiding them in times of emergency. Its features include spacious fire truck bays for quick deployment, administrative offices for seamless coordination, living quarters that ensure readiness, and training rooms to prepare firefighters for the unexpected. By incorporating modern green building technologies, architectural design and adequate facilities, this project aims to create a sustainable and supportive environment for our heroes. Moreover, the structure was designed using the provisions of the Ultimate Strength Design (USD) method and the National Structural Building Code of the Philippines (NSCP) 2015. The estimated cost is Php 18.379,624.87 which will be funded by the Bureau of Fire Protection (BFP) with an estimated completion of 240 days. It is recommended that it shall be implemented as soon as possible, checked further against the appropriate design, conduct their own geotechnical investigation, and once the structure is completely operational, safety and security devices such as fences, CCTVs, and other appropriate security measures should be installed.en_US
dc.format.extentxi, 218 leavesen_US
dc.language.isoen_USen_US
dc.publisherCentral Philippine Universityen_US
dc.subject.lccTA 145 .T67 2024en_US
dc.subject.lcshArchitectureen_US
dc.subject.lcshPublic buildings--Design and constructionen_US
dc.subject.lcshPublic buildings--Designs and plansen_US
dc.subject.lcshFire stations--Design and constructionen_US
dc.subject.lcshFire departments--Buildingsen_US
dc.subject.lcshFire risk assessmenten_US
dc.subject.lcshStructural control (Engineering)en_US
dc.subject.lcshBuildings, Reinforced concreteen_US
dc.subject.lcshSustainable architectureen_US
dc.subject.lcshGeotechnical engineeringen_US
dc.subject.lcshElectronic security systemsen_US
dc.titleProposed design of a three-storey municipal fire station in Alimodian, Iloiloen_US
dc.typeSpecial paperen_US
dcterms.accessRightsLimited public accessen_US
dc.description.bibliographicalreferencesIncludes bibliographical referencesen_US
dc.contributor.committeememberDela Cruz, Shevanee Ruth G.
dc.contributor.committeememberTuala, John Lorenz S.
dc.contributor.committeememberPedregosa, Lingelu F.
dc.contributor.departmentCollege of Engineeringen_US
dc.description.degreeBachelor of Science in Civil Engineeringen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record