Show simple item record

dc.contributor.adviserRizardo, Erwin L.
dc.contributor.authorAlingco, Czar Jezreel B.
dc.contributor.authorBernales, Jaymelson B.
dc.contributor.authorEvangelista, Jeniusfem Richie A.
dc.contributor.authorGloria, Norbert John G.
dc.contributor.authorLuces, Prince Jasmin R.
dc.coverage.spatialTapazen_US
dc.date.accessioned2025-02-08T06:51:05Z
dc.date.available2025-02-08T06:51:05Z
dc.date.issued2022-06
dc.identifier.citationAlingco, C. J. B., Bernales, J. B., Evangelista, J. R. A., Gloria, N. J. G., & Luces, P. J. R. (2022). Proposed design for special program in the arts: Dance and music building for Tapaz Central Elementary School in Tapaz, Capiz (Unpublished special paper). Central Philippine University.en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12852/3120
dc.descriptionAbstract onlyen_US
dc.description.abstractTapaz Central Elementary School (TCES) has sought to construct its own building and facilities to ensure that the quality of education is maintained. The project's objective is to design a two-story facility that includes both a performing hall and a classroom for the Tapaz Central Elementary School's Special Program in the Arts: Dance and Music. The project will include an enclosed function hall for dance and music demonstrations to prevent loitering during courses and a classroom to cater to students during art instruction. Noise Dampening curtains, LED lights, sound systems and air conditioning units are special features of the structure to provide comfort to its guests and performers. The structural design was made in line with the architectural design and load specifications. It was based on the Philippine National Structural Code (NSCP) 2015, as well as DepEd Specifications, and Codes imposed by law. The estimated cost of the proposed structure is Php 2,508,948.05. The proposed structure construction has a duration of 240 calendar days and the cost and estimates were based on the cost per unit prices. DepEd has set a budget for the Special Program in the Arts for district schools. According to the School Administration, a portion of the budget will also come from donations, such as those from the school's alumni and the Municipal Government, if permitted.en_US
dc.format.extentxi, 178 leavesen_US
dc.language.isoen_USen_US
dc.subject.lccTA 145 .A45 2022en_US
dc.subject.lcshBuildingen_US
dc.subject.lcshArchitectureen_US
dc.subject.lcshSchool buildings--Designen_US
dc.subject.lcshBuildings--Designen_US
dc.subject.lcshBuildings--Designs and plansen_US
dc.subject.lcshArts--Buildingsen_US
dc.titleProposed design for special program in the arts: Dance and music building for Tapaz Central Elementary School in Tapaz, Capizen_US
dc.typeSpecial paperen_US
dcterms.accessRightsNot publicly accessibleen_US
dc.description.bibliographicalreferencesIncludes bibliographical referencesen_US
dc.contributor.chairDela Cruz, Shevanee
dc.contributor.committeememberGrio, Mary Earl Daryl A.
dc.contributor.committeememberGepulango, Gerardo G.
dc.contributor.committeememberAjusan, Jovel S.
dc.contributor.departmentCollege of Engineeringen_US
dc.description.degreeBachelor of Science in Civil Engineeringen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record