Show simple item record

dc.contributor.adviserRizardo, Erwin L.
dc.contributor.authorDe Los Santos, Princess C.
dc.contributor.authorEscaño, Emmanuel Jr., M.
dc.contributor.authorGalimba, Persenie G.
dc.contributor.authorGellado, Judy Ann P.
dc.contributor.authorVarona, Lyke Dawn Angel G.
dc.date.accessioned2026-02-10T03:47:41Z
dc.date.available2026-02-10T03:47:41Z
dc.date.issued2022-06
dc.identifier.citationDe Los Santos, P. C., Escaño E. M., Galimba, P. G., Gellado, J. A. P., & Varona, L. D. A. G. (2022). Proposed vocational (weaving) training center in Barangay Luca, Ajuy, Iloilo [Unpublished bachelor's special paper]. Central Philippine University.en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12852/3691
dc.descriptionAbstract onlyen_US
dc.description.abstractA vocational school is an educational institution that can refer to either secondary or post-secondary education which aims to give vocational education or technical skills necessary to accomplish the requirements of a specific career. Barangay Luca, Ajuy is rich in livelihood skills that can help the families and their community as a whole. The barangay has a great number of weavers but without a proper avenue to display and cater to that skill. To address the concern, the town needs a vocational center to cater to the weavers which helps in the expansion of the livelihood as well as raise the economic status. The vocational center can not only be an avenue for the weavers to express their skill but to raise awareness and encouragement to the next generation of weavers as well. The proposed vocational center is a one-storey building made of reinforced concrete with a steel truss. The design standards and structural analysis of detailing works in the structural plan were based on the National Structural Code of the Philippines (NSCP) 2015, and Ultimate Strength Design (USD). Programs including AutoCAD and Microsoft Excel were used to calculate and design the project. The proposed vocational center in Barangay Luca, Ajuy has a total floor area of 513.11 square meters. The construction of the project has a total duration of 125 calendar days with a total cost of Php 2,776,003.89en_US
dc.format.extentx, 133 leavesen_US
dc.language.isoen_USen_US
dc.publisherCentral Philippine Universityen_US
dc.subject.lccTa 145 .D45 2022en_US
dc.subject.lcshArchitectureen_US
dc.subject.lcshPublic buildings--Design and constructionen_US
dc.subject.lcshPublic buildings--Designs and plansen_US
dc.subject.lcshVocational education facilitiesen_US
dc.subject.lcshWeaving--Study and teachingen_US
dc.subject.lcshHandlooms--Design and constructionen_US
dc.subject.lcshReinforced concrete constructionen_US
dc.subject.lcshTextile industryen_US
dc.subject.lcshCommunity centersen_US
dc.titleProposed vocational (weaving) training center in Barangay Luca, Ajuy, Iloiloen_US
dc.typeSpecial paperen_US
dcterms.accessRightsLimited public accessen_US
dc.description.bibliographicalreferencesIncludes bibliographical referencesen_US
dc.contributor.committeememberBieren, Marc Halcom Rey
dc.contributor.committeememberTuala, John Lorenz
dc.contributor.departmentCollege of Engineeringen_US
dc.description.degreeBachelor of Science in Civil Engineeringen_US


이 항목의 파일

Thumbnail

This item appears in the following Collection(s)

Show simple item record