Show simple item record

dc.contributor.adviserGrio, Mary Earl Daryl A.
dc.contributor.authorBelenson, Romel M., Jr.
dc.contributor.authorCalabio, Ronald C.
dc.contributor.authorCamancho, Jovan Karl C.
dc.contributor.authorCamarig, Clyde John C.
dc.contributor.authorTacubay, Ruth Joy G.
dc.date.accessioned2025-02-08T03:36:10Z
dc.date.available2025-02-08T03:36:10Z
dc.date.issued2023-05
dc.identifier.citationBelenson, R. M., Jr., Calabio, R. C., Camancho, J. K. C., Camarig, C. J. C., & Tacubay, R. J. G. (2023). Proposed design of two-storey municipal disaster risk reduction & management with emergency response buildings in Alimodian, Iloilo [Unpublished special paper]. Central Philippine University.en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12852/3114
dc.descriptionAbstract onlyen_US
dc.description.abstractThe Municipal Disaster Risk Reduction and Management Office (MDRRMO) and the Emergency Response Center (ERC) are responsible for developing strategies, carrying out initiatives, and facilitating the seamless integration of disaster risk reduction and climate change adaptation management efforts. The existing MDRRMO and ERC building currently faces spatial constraints. To address this limitation, the proposed design consists of a two-story structure to effectively house the entire workforce and specialized staff, thereby optimizing their role in serving the municipality of Alimodian. This proposed construction project is intended for Brgy. Poblacion, Alimodian, Iloilo. Furthermore, detailed plans for the planned structure's architecture, structural, electrical systems, plumbing, mechanical, and electronics have been completed. This study also includes construction specifications, cost estimates, and work schedules. Green technology features include low-emissivity glass, an allocated space on the rooftop for solar panels, and on the underground water supply of deepwell. The MDRRMO Building had a total floor area of 565.81 sq. m. for two floors and a lot area of 256 sq. m. The estimated cost of construction is PHP 14,183,942.82, and it is expected to be completed in 240 days. Inclusion of solar panels and deep well motor pump is strongly recommended.en_US
dc.format.extentx, 129 leaves : ill. (col).en_US
dc.language.isoen_USen_US
dc.publisherCentral Philippine Universityen_US
dc.subject.lccTA 145 .B45 2023en_US
dc.subject.lcshEngineering designen_US
dc.subject.lcshArchitectureen_US
dc.subject.lcshMunicipal buildingsen_US
dc.subject.lcshPublic buildings--Design and constructionen_US
dc.titleProposed design of two-storey municipal disaster risk reduction & management with emergency response buildings in Alimodian, Iloiloen_US
dc.typeSpecial paperen_US
dcterms.accessRightsLimited public accessen_US
dc.description.bibliographicalreferencesIncludes bibliographic referencesen_US
dc.contributor.committeememberSantacera, Linie Rose D.
dc.contributor.committeememberRizardo, Erwin L.
dc.contributor.committeememberBeup, Lyndon-Erl C.
dc.contributor.departmentCollege of Engineeringen_US
dc.description.degreeBachelor of Science in Civil Engineeringen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record