Ipakita ang simpleng tala ng item

dc.contributor.adviserGepulango, Gerardo
dc.contributor.authorLimuel, Allapitan J.
dc.contributor.authorFandiñola, Emce Jullian N.
dc.contributor.authorGalo, John Paul T.
dc.contributor.authorSantias, Nathaniel Thomas F.
dc.coverage.spatialMiagaoen_US
dc.date.accessioned2024-04-23T10:36:13Z
dc.date.available2024-04-23T10:36:13Z
dc.date.issued2021-02
dc.identifier.citationAllapitan, L. J., Fandiñola, E. J., Galo, J. P. T., & Santias, N. T. F. (2021). A proposed design of an integrated public transportation terminal in Barangay Igtuba, Miagao, Iloilo [Unpublished special paper]. Central Philippine University.en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12852/2976
dc.descriptionAbstract onlyen_US
dc.description.abstractTransportation in Miagao is widely used because even though it is a place which is located in a rural area, it is highly industrialized. Because of this, people tend to have problems regarding transportation for Miagao doesn’t have a proper transportation terminal. Thus, this gives rise to the main objective of this study which is designing an integrated transportation terminal that benefits not only the locality, but also the tourist that often visits the area.The proposed project in Brgy. Igtuba, Miagao is an integrated terminal, that can house 5 jeepneys, 60 tricycles and can cater loading/unloading buses. The proposed structure has a land area of 4,167 sq. meters, that consist of cafeteria, comfort rooms, offices for officials, waiting area and loading/unloading area for different kinds of transportation. The project is also installed with green building technology such as rainwater harvesting and natural lighting, the purpose of which is to lessen the consumption of electricity and water. This study includes the architectural design, electrical and plumbing layout, structural details, cost estimate, scheduling and traffic flow plan. The structural members were designed and based on the National Structural Code of the Philippines 2010. The total cost of the project is ₱ 18,535,416.00. For the design loads, dead load for the second floor is 5.946 kPa with a corresponding live load of 2.9 kPa. The Municipality of Miagao will be the one to provide the budget for the entire proposed project. The total duration of the project is 321 daysen_US
dc.format.extentix, 114en_US
dc.language.isoen_USen_US
dc.subject.lccTA 145 .A45 2021en_US
dc.subject.lcshDesignen_US
dc.subject.lcshCivil engineeringen_US
dc.subject.lcshBuildingen_US
dc.subject.lcshTransportationen_US
dc.subject.lcshTerminals (Transportation)--Design and constructionen_US
dc.titleA proposed design of an integrated public transportation terminal in Barangay Igtuba, Miagao, Iloiloen_US
dc.typeSpecial paperen_US
dcterms.accessRightsNot publicly accessibleen_US
dc.description.bibliographicalreferencesIncludes bibliographical references (111-114)en_US
dc.contributor.committeememberGrio, Mary Earl Daryl
dc.contributor.committeememberRizardo, Erwin
dc.contributor.departmentCollege of Engineeringen_US
dc.description.degreeBachelor of Science in Civil Engineeringen_US
local.subjectPublic transportationen_US


Mga file sa item na ito

Thumbnail

Lumilitaw ang item na ito sa mga sumusunod na (mga) Koleksyon

Ipakita ang simpleng tala ng item