Afficher la notice abrégée

dc.contributor.adviserGepulango, Gerardo G.
dc.contributor.authorCabangal, John Alvin W.
dc.contributor.authorEstenor, Glenn Ariel P.
dc.contributor.authorFaldas, Shiela M.
dc.coverage.spatialMiagaoen_US
dc.date.accessioned2022-10-21T02:50:46Z
dc.date.available2022-10-21T02:50:46Z
dc.date.issued2012
dc.identifier.citationCabangal, J. A. W. , Estenor, G. A. P. and Faldas, S. M. (2012). Proposed relocation and construction of the slaughterhouse of Miag-ao, Iloilo (Unpublished special paper). Central Philippine University, Jaro, Iloilo City.en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12852/2335
dc.descriptionAbstract onlyen_US
dc.description.abstractThe construction of a slaughterhouse is one of the priority projects in Miag-ao, Iloilo. This project is the answer to the dilapidated slaughterhouse in the said municipality. At present, there is an existing slaughterhouse but it is deteriorating due to some problems. One, there is no proper waste water treatment second, drainage system and the nearby residences are affected of the foul odour from the slaughterhouse. For this reason, the project proposal is introduced. This project study covers the structural and architectural design of the slaughterhouse. The structural design includes the design of trusses, columns, and footing. Ultimate Strength Design (USD) method is used in the design analysis of reinforced concrete structure and for all structural steel members. Steel reinforcement sizes of the Philippine Standard reinforcing bars are adopted. Reinforced concrete and steel are the main structural materials used in the construction. Steel is used in trusses and purlins of the main structure and reinforced concrete is used in slab, columns, footings, and walls. The proposed slaughterhouse has a rectangular shape with an area of 130 square meters. There is an adjoining lairage for housing livestock to be slaughtered. The duration of the proposed project will take 310 days and the estimated total project cost is 3,915,719.05php. The budget allocated for this project will come from the four million pesos allocated by the mayor. The one million of the said amount came from the “good housekeeping” fund from the Department of Interior and Local Government (DILG) and the rest came from the Internal Revenue Allotment (IRA). The management will be handled by the Municipality Planning and Development Coordinator (MPDC) of the said municipality.en_US
dc.language.isoenen_US
dc.subject.ddcReference Theses 624.072 C111en_US
dc.subject.lcshSlaughtering and slaughter-housesen_US
dc.subject.lcshBuildingen_US
dc.subject.lcshBusiness relocationen_US
dc.subject.lcshArchitectureen_US
dc.subject.lcshPhilippines--Iloilo--Miag-aoen_US
dc.titleProposed relocation and construction of the slaughterhouse of Miag-ao, Iloiloen_US
dc.typeSpecial paperen_US
dcterms.accessRightsNot publicly accessibleen_US
dc.description.bibliographicalreferencesIncludes bibliographical referencesen_US
dc.contributor.committeememberGrio, Mary Earl Daryl
dc.contributor.committeememberRizardo, Erwin L.
dc.contributor.departmentCollege of Engineeringen_US
dc.description.degreeBachelor of Science in Civil Engineeringen_US


Fichier(s) constituant ce document

Thumbnail

Ce document figure dans la(les) collection(s) suivante(s)

Afficher la notice abrégée