Search
Now showing items 1-2 of 2
A study to improve efficient islanding operation of 72 MW diesel engine power generating system of Panay Power Corporation
(2002)
At present, the 72 MW Panay Power Corporation operation department as well as the efficiency and result officer are very much aware of the situation that the ratio of fuel consumed by the system and the power generated is ...
Upgrading of Asian Alcohol Corporation 1.5 MVA power substation 4.160 KV main circuit protection for normal and continuous production
(2007)
The purpose of this study is to determine the needs and requirements for a best design for the upgrading of Asian Alcohol Corporation (AAC) 1.5 MVA power substation main circuit protection for a reliable and continuous ...