A study to improve efficient islanding operation of 72 MW diesel engine power generating system of Panay Power Corporation
Page views
291Дата
2002Автор
Thesis Adviser
Defense Panel Chair
Defense Panel Member
Share
Metadata
Показать полную информацию
Аннотации
At present, the 72 MW Panay Power Corporation operation department as well as the efficiency and result officer are very much aware of the situation that the ratio of fuel consumed by the system and the power generated is below its expectation. The performance of the generating units is focused and reflected on the fuel rate calculation on a day to day basis.
The company is presently generating an average value of 1100 MWH a day and it is gradually increasing as months and years pass by. The total fuel consumed per day is more or less 25,000 liters. 99% of the total fuel used is Bunker C fuel. Only 1% or less is Diesel fuel depending on how efficient the generating unit operates, the fuel quality, range and variability of the load caused by external end users. However, fuel quality, engine trouble, power interruption, power factor adjustments and any other abnormalities encountered and took place during the operation will not be included in the discussion anymore. It will be explained further in the scope and limitation.
The main concern of the company is concentrated on how to improve fuel rate or power plant efficiency thru operation side or operator’s point of view. This is what the study is all about. It includes reduction of fuel consumption while maintaining its generating power output.
The first step is to identify and pinpoint the factors that affect power plant efficiency at normal islanding operation. Data pertaining to these factors will be properly analyzed and interpreted. Understanding these factors will give us a better perspective and idea on how to formulate, create and modify new operating strategy in order to improve efficient operation. It will also help, guide and give the operator the greater strategy to utilize and handle power plant equipment to optimum performance without compromising the durability of the unit and reliability of the system.
Описание
Abstract only
Suggested Citation
Betita, L. D. (2002). A study to improve efficient islanding operation of 72 MW diesel engine power generating system of Panay Power Corporation (Unpublished Master's special paper). Central Philippine University, Jaro, Iloilo City.
Type
Special paperТематика
Keywords
Department
School of Graduate StudiesDegree
Master of EngineeringShelf Location
GSL Theses 620.0072 B465
Physical Description
vii, 52 leaves
Collections
Связанные элементы
Просмотр элементов, связанных по названию, автору, создателю или теме.
-
A proposed intervention to improve the power quality and system efficiency of Calinog substation feeder 2
Roquios, Jose Redmond Eric S. (2007)Rationale Iloilo II Electric Cooperative, Inc. (ILECO II) is an electric distribution utility which supply electric power to the central part of the Province of Iloilo. With the passage of the RA 9136 otherwise known as ... -
Power demand medium term forecasting for Vitarich Corporation using data mining algorithm
Boron, Wilfred O.; Anacan, James Paul D.; Haro, El Vee Joice G.; Sedotes, James Nikko F. (2020)Forecasting provides a well founded decision in making future developments, in maintaining a stable system, and in avoiding technical risks. This study focuses on data mining the historical records of Vitarich Corporation, ... -
Rehabilitation, testing, and evaluation of the solar PV system of Filamer Christian University, Roxas City, Capiz
Dador, Jomar A. (2013)This study aimed to rehabilitate, test, and evaluate the solar PV system of Filamer Christian University (FCU), Roxas City, Capiz. The rehabilitation of the PV system is expected to provide numerous benefits to the university ...