• English
    • Filipino
    • 中文
    • 한국어
    • français
    • русский
  • русский 
    • English
    • Filipino
    • 中文
    • 한국어
    • français
    • русский
  • Войти
Просмотр элемента 
  •   Главная
  • College of Engineering
  • Undergraduate Research
  • Special Papers
  • Bachelor of Science in Civil Engineering
  • Просмотр элемента
  •   Главная
  • College of Engineering
  • Undergraduate Research
  • Special Papers
  • Bachelor of Science in Civil Engineering
  • Просмотр элемента
JavaScript is disabled for your browser. Some features of this site may not work without it.

Proposed design of new four storey city hall at Passi City Iloilo

Thumbnail
Открыть
BSCE_AvanceDRB_2023_fulltext_part1_3369.pdf (17.07Mb)
Downloads: 874
Page views
721
Дата
2023-06
Автор
Avance, Doreen Rose B.
Bascoguin, Frederick Anton B.
Daquil, Karl Cristian P.
Marcos, Von Mauric R.
Tan, Louise Elaine V.
Thesis Adviser
Tuala, John Lorenz S.
Defense Panel Member
Grio, Mary Earl Daryl A.
Santacera, Linie Rose D.
Abaygar, Peter John B.
Share 
 
Metadata
Показать полную информацию

Аннотации
The executive branch of the government is manifested by the local government units (LGUs). Common administrative functions include governance, public services, revenue generation, and intergovernmental relations. For an LGU to function properly it needs a City Hall that is organized and competent in handling transactions, something the current City Hall of Passi lacks. This disarray and congestion of offices results in longer and inefficient transaction time. This project study provides the design for a four-storey. 6293 sq. m . city hall with 36 offices, a waiting area, pantries and conference rooms. Special features include the use of film-coated windows for temperature and UV rays control. The structural design was based on the National Structural Code of the Philippines (NSCP) 2015 while the plumbing, sanitary and electrical designs followed their respective codes and standards. The estimated cost of the project is PhP 129,039,164.59 based on the present cost of materials. The construction time of the structure is approximately 360 working days and shall be funded by the LGU-Passi City. It is recommended to consider other sources of water to meet future demands of the clients for drinking and for other domestic uses.
Описание
Full text available.

For the architectural plans, please send your request at bahandian.cpu.edu.ph
URI
https://hdl.handle.net/20.500.12852/3369
Suggested Citation
Avance, D. R. B., Bascoguin, F. A. B., Daquil, K. C. P., Marcos, V. M. R., & Tan, L. E. V. (2023). Proposed design of new four storey city hall at Passi City Iloilo [Unpublished special paper]. Central Philippine University.
Type
Special paper
Тематика
Public buildings--Design and construction OCLC - FAST (Faceted Application of Subject Terminology); City halls--Design and construction OCLC - FAST (Faceted Application of Subject Terminology); Municipal buildings--Design and construction OCLC - FAST (Faceted Application of Subject Terminology); Administrative agencies OCLC - FAST (Faceted Application of Subject Terminology); Sustainable buildings--Design and construction OCLC - FAST (Faceted Application of Subject Terminology); Structural design OCLC - FAST (Faceted Application of Subject Terminology)
Department
College of Engineering
Degree
Bachelor of Science in Civil Engineering
Shelf Location
TA 145 .A93 2023
Physical Description
98 leaves
Collections
  • Bachelor of Science in Civil Engineering [29]

Связанные элементы

Просмотр элементов, связанных по названию, автору, создателю или теме.

  • Thumbnail

    Development of computer program for the design of spread footing, axially loaded square column, and simply supported singly-reinforced concrete beam 

    Jimenez, Liza Grace J. (2001)
    The special project shall develop a program that would design commonly used reinforced concrete structures such as simple beam, column and isolated foundation footings. The language of programming to be used shall be Visual ...
  • Thumbnail

    The current utilization and clientele preferences of the University of St. La Salle library[: A] basis for designing spaces for learning commons 

    Sanoria, Maricel T. S. (2018)
    The study was conducted to determine the current utilization of the library spaces, the clientele’s perception of the current design of the library spaces and the clientele’s library preferences of spaces. The results of ...
  • Thumbnail

    Proposed two-storey motor pool building in Passi City, Iloilo 

    Liza, Karen Kate P.; Pamplona, Matthew V.; Perualila, Jessa Arian S. (Central Philippine University, 2024-06)
    The local government's pivotal role in promoting community development and infrastructure improvement has been key to Passi City's success. Through strategic initiatives and collaborative efforts, the municipality has ...

Контакты | Отправить отзыв | https://creativecommons.org/licenses/by/4.0/ Logo by HLL
Central Philippine University © 2025
Managed by 
Henry Luce III LibraryHenry Luce III Library
 

 

Links
BAHÁNDÌAN Repository GuideDisclaimerFAQsSubmit your workNews and Updates

Просмотр

Весь DSpaceСообщества и коллекцииДата публикацииАвторыНазванияТематикаЭта коллекцияДата публикацииАвторыНазванияТематика

Моя учетная запись

ВойтиРегистрация

Статистика

Просмотр статистики использования
CPU Henry Luce III Library

Контакты | Отправить отзыв | https://creativecommons.org/licenses/by/4.0/ Logo by HLL
Central Philippine University © 2025
Managed by 
Henry Luce III LibraryHenry Luce III Library
 

 

EXTERNAL LINKS DISCLAIMER

This link is being provided as a convenience and for informational purposes only. Central Philippine University bears no responsibility for the accuracy, legality or content of the external site or for that of subsequent links. Contact the external site for answers to questions regarding its content.

If you come across any external links that don't work, we would be grateful if you could report them to the repository administrators.

Click DOWNLOAD to open/view the file. Chat Bertha to inform us in case the link we provided don't work.

Download